Case study

Three sites – PV 2 MWp – BESS 1,080 kWh

Long-built trust of a large retail chain, proven at three sites and extended with battery storage in a modified shipping container.

Anonymised reference · Dobřany, Lipník nad Bečvou, Smiřice · 2021–2025

From brief to result

How we approached the project

Challenge

Three logistics sites with continuous refrigeration required a repeatable technical standard, precise coordination with operations and a uniform approach to monitoring. The third and largest project also combined PV with a large battery storage system.

Solution

XENIUM successively delivered PV plants of 546.3 kWp in Dobřany, 544 kWp in Lipník nad Bečvou and 910 kWp in Smiřice. The Smiřice phase also included a 1,080 kWh BESS in a modified shipping container.

Result

Three projects from 2021, 2022 and 2025 created a portfolio with an output of approximately 2 MWp. The repeat cooperation confirms the ability to maintain consistent quality, monitoring and service across several operations of one customer.

At a glance

What the project means in practice

The same customer gradually proved the solution at three operations. The first two sites mainly use instantaneous generation from the roofs; the third added a large battery that allows part of the energy to be used later and helps manage demand peaks.

Technical overview

Dobřany
PV 546.3 kWp, delivered 2021
Lipník nad Bečvou
PV 544 kWp, delivered 2022
Smiřice
PV 910 kWp + BESS 1,080 kWh, delivered 2025
Storage
Ten Pylontech battery racks, Sinexcel converters, a modified shipping container

Technical data

Diagrams that help explain the solution

The examples are based on design documentation for typical solutions. They explain the principle of the solution; specific documentation is always prepared according to the building, the operation and the grid connection conditions.

Illustrative block diagram of a BESS battery storage connection

How the BESS is connected to the energy system

Illustrative design diagram: the battery container is connected to the distribution board and the distribution grid via the PCS power unit. The actual connection is always designed according to the power, operation and grid connection conditions.

Project story

The context behind the result

01 · Three phases

From the first roof to PV with storage

The cooperation began in 2021 with an installation in Dobřany. A year later came Lipník nad Bečvou, where the high and stable consumption of the logistics operation allows the generated energy to be used directly on site.

The largest phase was built in Smiřice in 2025: a 910 kWp PV plant complemented by ten Pylontech battery racks and Sinexcel converters in a specially modified container.

02 · A network of operations

Uniform technology and one monitoring system

For a multi-site customer, what matters is not only generation but also harmonised operating procedures. All three power plants use a common monitoring logic, so the customer and the service team track the status of each site in the same way.

The battery storage in Smiřice extended the original direct-consumption model with management of demand peaks and use of energy outside the time of instantaneous generation.

What matters about the project

Main benefits and technical conclusions of the project

multi-site project for the retail segment

combination of PV and containerised BESS

a reference suitable for companies with multiple sites

3 projects, 2 MWp of photovoltaics and a 1,080 kWh BESS

Anonymised case study of a completed XENIUM project.

Related references

More projects from the same segment

Frýdek-Místek – PV 249 kWp – LED lighting and lightning protection

A layered energy project for a manufacturing site, where photovoltaics, new lightning protection and gradual replacement of lighting followed one another.

View the case study

Czech Republic – PV 192 kWp – BESS 226 kWh

An energy system for an operation where a power outage must not stop cooling and endanger the vacuum hardening equipment.

View the case study

Krnov – PV 218 kWp – BESS 416 kWh

A project for meat processing, where photovoltaics and storage protect continuous refrigeration and reduce costs at the same time.

View the case study

From a reference to your project

A similar result starts with an analysis of the specific operation